This website does readability filtering of other pages. All styles, scripts, forms and ads are stripped. If you want your website excluded or have other feedback, use this form.

Skip to main content

Curbed NY homepage New York

Follow Curbed NY online:

Log in or sign up

Site search

Filed under:

15 Hudson Yards tops out as megaproject preps for spring 2019 debut

New, 9 comments

Hudson Yards is on track to open next March

By Amy Plitt@plitter Feb 27, 2018, 10:02am EST

Share this story

Share All sharing options for: 15 Hudson Yards tops out as megaproject preps for spring 2019 debut

Courtesy Related-Oxford

More than five years after Hudson Yards got its groundbreaking, the megaproject has reached another milestone: According to developers Related Companies and Oxford Properties Group, 15 Hudson Yards, the complex’s first residential building, has topped out.

The building, designed by Diller Scofidio + Renfro in collaboration with Rockwell Group, stands 917 feet tall—not quite hitting supertall status, but large enough to create an imposing presence. It has 285 apartments, four of which are pricey penthouses located at its crown, along with a bevy of over-the-top amenities that include a 75-foot swimming pool, a screening room, and a co-working space that’s essentially a WeWork for the building’s residents. The building also abuts The Shed, the megaproject’s forthcoming cultural space that’s also designed by DS+R and the Rockwell Group.

Those apartments hit the market in the fall of 2016, and as of this writing, more than half of the units have sold; Related CEO Jeff Blau said in a statement that interest “has far exceeded everyone’s expectations.”

What’s left ranges from a $3.9 million two-bedroom to an aforementioned 88th-floor penthouse, asking $32 million. (The building is also due to have 100 affordable apartments, but details for those have yet to be announced.) According to the developers, residents are expected to move in at the end of 2018.

That’s in keeping with the broader timeline for the megadevelopment; according to the developers, the first phase of Hudson Yards—comprising several buildings, the Shops at Hudson Yards, a public park, and Thomas Heathewick’s Vessel—will open next March, a little more than a year from now. In the past few months alone, the Vessel has topped out, and several of the other skyscrapers are getting close to that point.

As Related and Oxford finish up Phase 1 of the megaproject, the rumormongering about Phase 2 has begun: Earlier this month, sources told the Wall Street Journal that Frank Gehry and Santiago Calatrava will design towers for the west side rail yards portion of the project, which is still a ways off from getting started.

Next Up In NYC Construction News

Sign up for the Curbed NY Newsletter

Loading comments...

The Latest

As NYC subway performance improves, ridership is increasing 

Subway ridership has increased 4.5 percent since last year, the MTA says.

By Valeria Ricciulli 1 comment / new

Wall collapses at fire-gutted Lower East Side synagogue: FDNY

The building suffered a 2017 fire and is in the midst of a redevelopment.

By Caroline Spivack 1 comment / new

This year’s Rockefeller Center Christmas Tree is a Norway spruce from New York state

The tree will be lit on December 4.

By Valeria Ricciulli 6 comments / new

New York Public Library’s main branch opens new research space

The new space is part of the library’s master plan to revamp several areas of its Fifth Avenue building.

By Valeria Ricciulli

Netflix will briefly reopen Midtown’s shuttered Paris Theater

Plus, why black homeowners are being targeted for fruad—and more intel in today’s New York Minute news roundup

By Caroline Spivack 2 comments / new

Where should the next NYC busway be? Experts weigh in

The runaway success of the 14th Street car ban makes similar interventions in the city a no-brainer

By Amy Plitt 11 comments / new
New York

Share this story